PROJECT CASE STUDY · WHOLE-HOME REMODELING

University Place whole-home remodel: from open studs to a finished main floor

University Place, Washington · Whole-home remodel · Finished May 2025

REQUEST A FREE ESTIMATE ↗ CALL (253) 218-9421

The finished University Place main floor, with dark kitchen cabinets, a long island, hardwood floors and stair railings.
May 2025: the finished main floor.

At a glance

Location
University Place, WA
Project type
Whole-home remodel: main floor, kitchen and bathroom
Timeline
First walkthrough in July 2024; work underway by September 2024; finished in May 2025
Features
16-foot kitchen island with a continuous countertop, black marble-look fireplace, hardwood and tile floors, custom stair railings

The project

This University Place home got a whole-home remodel led by owner Mike Frazier and the Premier Legacy Builders crew. The finished main floor has a 16-foot kitchen island with a continuous countertop, dark cabinets, hardwood and tile flooring, custom stair railings and a black marble-look fireplace. The bathroom was rebuilt too.

We did our first walkthrough in July 2024, and the crew was at work by September 2024. The photos below show the work from before to finished.

Opening the house up

The first photos, from July 2024, show the home as it was: a bathroom with a built-in tub and glass shower stall, and a main floor with a half wall and dark wood paneling. By September 2024 the crew had the old floor up and walls opened to the studs, and the main floor was being re-framed.

The University Place main floor in July 2024 before work began, with a half wall and a dark wood-paneled kitchen area.
July 2024: the main floor before work began.
A Premier Legacy Builders crew member standing in a University Place room with the old floor torn up and the wall opened to the studs.
September 2024: crew at work with the old floor up and the wall opened to the studs.
The University Place main floor opened up in September 2024, with framed openings and lumber stacked on the floor.
September 2024: the main floor opened up and re-framed.

The bathroom

In January 2025 the crew laid a waterproof membrane over the bathroom subfloor. In February they were setting tile on the shower wall over the membrane. The finished bathroom, photographed in May 2025, has a gray vanity, a lighted mirror and marble-look floor tile.

A Premier Legacy Builders crew member working on the bathroom floor at University Place, with an orange waterproofing membrane laid over the subfloor.
January 2025: crew laying the waterproof membrane in the bathroom.
A Premier Legacy Builders crew member setting tile on a University Place shower wall over an orange waterproofing membrane, using spacer clips.
February 2025: crew setting tile on the shower wall.
The finished University Place bathroom with a gray vanity, a lighted mirror and marble-look floor tile.
May 2025: the finished bathroom vanity and floor.

The kitchen and main floor

Through February and March 2025 the crew worked the main floor: new walls, recessed lighting and flooring first, then the dark cabinets and the island, which was built in place. The finished island runs 16 feet with a continuous countertop. Hardwood and tile floors, custom stair railings and a black marble-look fireplace complete the room.

Premier Legacy Builders crew members working on the University Place main floor in February 2025, with new walls, recessed lights and tools on the floor.
February 2025: crew at work on the main floor.
Dark kitchen cabinets set in place on the University Place main floor in March 2025, with the island base in the foreground.
March 2025: the dark kitchen cabinets going in.
The University Place kitchen island built in place in March 2025, with cabinets along the wall and marble-look tile on the floor.
March 2025: the island built in place on the tile floor.
The finished University Place kitchen with a long island with a continuous countertop, dark cabinets and marble-look tile floor.
May 2025: the finished island and kitchen.

The finished home

By May 2025 the main floor was finished: the long island and dark cabinets in the kitchen, hardwood and tile underfoot, wood and iron stair railings, and the black marble-look fireplace as the centerpiece. Every project is different, and this one shows how our crew works on a whole-home job from the first demolition photo to the last coat of finish.

LET'S TALK ABOUT YOUR PROJECT

Tell us what you have in mind.

Mike Frazier and the Premier Legacy Builders crew review every inquiry personally. Nothing here commits you to a scope or budget.

START YOUR PROJECT ↗

REQUEST A FREE ESTIMATE

Send this project.

Share a little about the work. We will follow up from our Fife-based crew.

This goes to Premier Legacy Builders as a website inquiry. We do not sell your information.

Planning a Remodeling or Reconstruction Project?

Tell Premier Legacy Builders about your project, location and goals. We handle residential and commercial remodeling, additions, ADUs and DADUs, tenant improvements, and reconstruction across South Puget Sound.

Discuss Your Project Call (253) 218-9421

READY WHEN YOU ARE

Start Your Project

Mike Frazier and the Premier Legacy Builders crew review every idea personally. Tell us what you're planning — nothing here commits you to a scope or budget.

Mike and Gabe from Premier Legacy Builders on an active interior construction jobsite
✦ START YOUR PROJECT